Williston Basin Interstate Pipeline Co.
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 02/01/1997, Docket: RP97-215-002, Status: Effective
First Revised Sheet No. 329A First Revised Sheet No. 329A : Effective
Superseding: Original Sheet No. 329A
GENERAL TERMS AND CONDITIONS (Continued)
38. FUEL REIMBURSEMENT ADJUSTMENT PROVISION (Continued)
the Electric Power Unrecovered
Fuel Reimbursement Account-
Transportation during
Transporter's deferral period,
defined as the twelve (12) month
period ending four (4) months
prior to the effective date of
Transporter's annual filing
described in Subsection 38.5.1.2,
by the quantity of transportation
receipts projected by Transporter
for the twelve (12) month
effective period beginning August
1 of each year. The per unit
Electric Power Fuel Reimbursement
Surcharge Percentage-
Transportation shall be
determined by dividing the per
unit Electric Power Fuel
Reimbursement Surcharge Amount-
Transportation by the projected
system annual average cost of gas
reflected in the same filing.
38.5.1.5.3 The sum of the per unit Gas Fuel
Reimbursement Surcharge Amount-
Transportation and the per unit
Electric Power Fuel Reimbursement
Surcharge Amount-Transportation
as described hereof in
Subsections 38.5.1.5.1 and
38.5.1.5.2, respectively, shall
constitute the Fuel Reimbursement
Surcharge Amount-Transportation.
The sum of the per unit Gas Fuel
Reimbursement Surcharge
Percentage-Transportation and the
Electric Power Fuel Reimbursement
Surcharge Percentage-
Transportation as described
hereof in Subsections 38.5.1.5.1
and 38.5.1.5.2, respectively,