38. FUEL REIMBURSEMENT ADJUSTMENT PROVISION (Continued)
August 1 of each year. The per
unit Gas Fuel Reimbursement
Surcharge Percentage-Storage
shall be determined by dividing
the per unit Gas Fuel
Reimbursement Surcharge Amount-
Storage by the projected system
annual average cost of gas
reflected in the same filing.
38.5.1.4.2 The per unit Electric Power Fuel
Reimbursement Surcharge Amount-
Storage shall be determined by
dividing the applicable amounts
accumulated in the Electric Power
Unrecovered Fuel Reimbursement
Account-Storage during
Transporter's deferral period,
defined as the twelve (12) month
period ending four (4) months
prior to the effective date of
Transporter's annual filing
described in Subsection 38.5.1.2,
by the sum of the contract
storage injections and
withdrawals projected by
Transporter for the twelve (12)
month effective period beginning
August 1 of each year. The per
unit Electric Power Fuel
Reimbursement Surcharge
Percentage-Storage shall be
determined by dividing the per
unit Electric Power Fuel
Reimbursement Surcharge Amount-
Storage by the projected annual
system average cost of gas
reflected in the same filing.
38.5.1.4.3 The sum of the per unit Gas Fuel
Reimbursement Surcharge Amount-
Storage and the per unit Electric
Power Fuel Reimbursement
Surcharge Amount-Storage as