Williston Basin Interstate Pipeline Co.

Second Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 09/01/2003, Docket: RP03-286-000, Status: Suspended

Second Revised Sheet No. 324A Second Revised Sheet No. 324A : Suspended

Superseding: First Revised Sheet No. 324A

GENERAL TERMS AND CONDITIONS (Continued)

 

38. FUEL AND ELECTRIC POWER REIMBURSEMENT ADJUSTMENT PROVISION (Continued)

 

38.7 Electric Power Reimbursement Deferral Rate:

 

38.7.1 The Electric Power Reimbursement Deferral Rate-

(Gathering, Storage and/or Transportation) shall be determined by

dividing the applicable balance accumulated in the Electric Power

Reimbursement Deferral Account-(Gathering, Storage and/or

Transportation), defined as the net cumulative balance for the

deferral period ending three (3) months prior to the effective

date of Transporter's annual filing described in Subsection 38.2,

by the applicable Projected Quantities.

 

38.7.2 Electric Power Reimbursement Deferral Account

 

38.7.2.1 Transporter shall establish and maintain

subaccounts of the Electric Power Reimbursement Deferral

Account-(Gathering, Storage and/or Transportation), as

applicable to accumulate under-recovered and/or over-

recovered electric power costs. The accumulated balance of

each deferral subaccount in Account No. 182.3 may include

the following:

 

38.7.2.1.1 The monthly deferral resulting from

Transporter's under- or over-recovery of actual

gathering, storage and/or transportation electric

power reimbursement, as applicable.

 

38.7.2.1.1.1 Transporter shall first

determine the actual monthly Gathering, Storage

and/or Transportation Electric Power cost.

Transporter shall then determine the allocation

of actual monthly Storage Electric Power Cost

to contract storage injections and/or

withdrawals based on the ratio of the sum of

actual contract storage injections and/or

withdrawals to the total of the actual system

storage injections and/or withdrawals and

actual contract storage injections and/or

withdrawals.

 

38.7.2.1.1.2 Transporter shall then

determine the actual monthly Transportation and

System Storage Electric Power Costs applicable

to Transportation.