Williston Basin Interstate Pipeline Co.

Second Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 08/01/2003, Docket: RP03-286-004, Status: Effective

Fourth Revised Sheet No. 324A Fourth Revised Sheet No. 324A : Effective

Superseding: Third Revised Sheet No. 324A

GENERAL TERMS AND CONDITIONS (Continued)

 

38. FUEL AND ELECTRIC POWER REIMBURSEMENT ADJUSTMENT PROVISION (Continued)

 

38.6.2.1.1 The monthly deferral resulting from

Transporter's under- or over-recovery of actual

gathering, storage and/or transportation electric

power reimbursement, as applicable.

 

38.6.2.1.1.1 Transporter shall first

determine the actual monthly Gathering, Storage

and/or Transportation Electric Power cost.

Transporter shall then determine the allocation

of actual monthly Storage Electric Power Cost

to contract storage injections and/or

withdrawals based on the ratio of the sum of

actual contract storage injections and/or

withdrawals to the total of the actual system

storage injections and/or withdrawals and

actual contract storage injections and/or

withdrawals.

 

38.6.2.1.1.2 Transporter shall then

determine the actual monthly Transportation and

System Storage Electric Power Costs applicable

to Transportation.

 

38.6.2.1.1.3 Transporter shall then

determine the Cost of Electric Power for

Gathering, Storage and/or Transportation,

recovered by multiplying the Electric Power

Reimbursement Current Rate-(Gathering, Storage

and/or Transportation), in effect, as

applicable, by the total actual quantity of

applicable gathering, storage and/or

transportation service during that month. The

monthly deferral amount shall be the difference

between the costs derived in Subsections

38.6.2.1.1.1 or 38.6.2.1.1.2 and 38.6.2.1.1.3

herein, as applicable.

 

 

 

(The rest of this sheet has been intentionally left blank.)