Williston Basin Interstate Pipeline Co.
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 08/01/2003, Docket: RP03-286-004, Status: Effective
Fourth Revised Sheet No. 324A Fourth Revised Sheet No. 324A : Effective
Superseding: Third Revised Sheet No. 324A
GENERAL TERMS AND CONDITIONS (Continued)
38. FUEL AND ELECTRIC POWER REIMBURSEMENT ADJUSTMENT PROVISION (Continued)
38.6.2.1.1 The monthly deferral resulting from
Transporter's under- or over-recovery of actual
gathering, storage and/or transportation electric
power reimbursement, as applicable.
38.6.2.1.1.1 Transporter shall first
determine the actual monthly Gathering, Storage
and/or Transportation Electric Power cost.
Transporter shall then determine the allocation
of actual monthly Storage Electric Power Cost
to contract storage injections and/or
withdrawals based on the ratio of the sum of
actual contract storage injections and/or
withdrawals to the total of the actual system
storage injections and/or withdrawals and
actual contract storage injections and/or
withdrawals.
38.6.2.1.1.2 Transporter shall then
determine the actual monthly Transportation and
System Storage Electric Power Costs applicable
to Transportation.
38.6.2.1.1.3 Transporter shall then
determine the Cost of Electric Power for
Gathering, Storage and/or Transportation,
recovered by multiplying the Electric Power
Reimbursement Current Rate-(Gathering, Storage
and/or Transportation), in effect, as
applicable, by the total actual quantity of
applicable gathering, storage and/or
transportation service during that month. The
monthly deferral amount shall be the difference
between the costs derived in Subsections
38.6.2.1.1.1 or 38.6.2.1.1.2 and 38.6.2.1.1.3
herein, as applicable.
(The rest of this sheet has been intentionally left blank.)