Williston Basin Interstate Pipeline Co.

Second Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 09/01/2003, Docket: RP03-286-000, Status: Suspended

Third Revised Sheet No. 324 Third Revised Sheet No. 324 : Suspended

Superseding: Second Revised Sheet No. 324

GENERAL TERMS AND CONDITIONS (Continued)

 

38. FUEL AND ELECTRIC POWER REIMBURSEMENT ADJUSTMENT PROVISION (Continued)

 

38.6.2.1 The Electric Power Reimbursement Current Rate

per unit of contract storage service shall be determined by

first apportioning Transporter's projected storage cost of

electric power (Storage Electric Power Cost) for the

effective period to contract storage service (i.e.,

injections and/or withdrawals under Rate Schedules FS-1 and

IS-1) based on the ratio of the sum of projected contract

storage injections and/or withdrawals (Projected Contract

Storage Quantities) to the total of the projected system

storage (i.e., Transporter's storage injections and/or

withdrawals for maintenance of balancing and line pack) and

Projected Contract Storage Quantities. The Electric Power

Reimbursement Current Percentage per unit of contract

storage service shall then be calculated by dividing the

Storage Electric Power Cost apportioned to the contract

storage service by the applicable Projected Contract Storage

Quantities for the effective period to calculate the

Electric Power Reimbursement Current Rate-Storage.

 

38.6.2.2 The Electric Power Reimbursement Current Rate

per unit of transportation service shall include the

projected transportation cost of electric power

(Transportation Electric Power Cost) for the effective

period and the portion of Transporter's projected storage

cost of electric power not allocated to contract storage

(System Storage Electric Power Cost) as described in

Subsection 38.6.2.1 hereof. The sum of the System Storage

Electric Power Cost and the Transportation Electric Power

Cost shall be divided by the Projected Transportation

Quantities for the effective period to calculate the

Electric Power Reimbursement Current Rate-Transportation.

 

38.6.3 The resulting Electric Power Reimbursement Current

Rate-(Gathering, Storage and/or Transportation), plus any

applicable flex adjustment, as described in Subsection 38.3

hereof, shall be added to the Electric Power Reimbursement

Deferral Rate-(Gathering, Storage and/or Transportation), as

determined in accordance with Subsection 38.7 hereof, to

calculate the Total Electric Power Reimbursement Rate-(Gathering,

Storage and/or Transportation).