38. FUEL AND ELECTRIC POWER REIMBURSEMENT ADJUSTMENT PROVISION (Continued)
38.6.2.1 The Electric Power Reimbursement Current Rate
per unit of contract storage service shall be determined by
first apportioning Transporter's projected storage cost of
electric power (Storage Electric Power Cost) for the
effective period to contract storage service (i.e.,
injections and/or withdrawals under Rate Schedules FS-1 and
IS-1) based on the ratio of the sum of projected contract
storage injections and/or withdrawals (Projected Contract
Storage Quantities) to the total of the projected system
storage (i.e., Transporter's storage injections and/or
withdrawals for maintenance of balancing and line pack) and
Projected Contract Storage Quantities. The Electric Power
Reimbursement Current Percentage per unit of contract
storage service shall then be calculated by dividing the
Storage Electric Power Cost apportioned to the contract
storage service by the applicable Projected Contract Storage
Quantities for the effective period to calculate the
Electric Power Reimbursement Current Rate-Storage.
38.6.2.2 The Electric Power Reimbursement Current Rate
per unit of transportation service shall include the
projected transportation cost of electric power
(Transportation Electric Power Cost) for the effective
period and the portion of Transporter's projected storage
cost of electric power not allocated to contract storage
(System Storage Electric Power Cost) as described in
Subsection 38.6.2.1 hereof. The sum of the System Storage
Electric Power Cost and the Transportation Electric Power
Cost shall be divided by the Projected Transportation
Quantities for the effective period to calculate the
Electric Power Reimbursement Current Rate-Transportation.
38.6.3 The resulting Electric Power Reimbursement Current
Rate-(Gathering, Storage and/or Transportation), plus any
applicable flex adjustment, as described in Subsection 38.3
hereof, shall be added to the Electric Power Reimbursement
Deferral Rate-(Gathering, Storage and/or Transportation), as
determined in accordance with Subsection 38.7 hereof, to
calculate the Total Electric Power Reimbursement Rate-(Gathering,
Storage and/or Transportation).