GENERAL TERMS AND CONDITIONS (Continued)
38. FUEL AND ELECTRIC POWER REIMBURSEMENT ADJUSTMENT PROVISION (Continued)
38.5.2.2 The Electric Power Reimbursement Current Rate
per unit of transportation service shall include the
projected transportation cost of electric power
(Transportation Electric Power Cost) for the effective
period and the portion of Transporter's projected storage
cost of electric power not allocated to contract storage
(System Storage Electric Power Cost) as described in
Subsection 38.5.2.1 hereof. The sum of the System Storage
Electric Power Cost and the Transportation Electric Power
Cost shall be divided by the Projected Transportation
Quantities for the effective period to calculate the
Electric Power Reimbursement Current Rate-Transportation.
38.5.3 The resulting Electric Power Reimbursement Current
Rate-(Gathering, Storage and/or Transportation) shall be added to
the Electric Power Reimbursement Deferral Rate-(Gathering,
Storage and/or Transportation), as determined in accordance with
Subsection 38.6 hereof, to calculate the Total Electric Power
Reimbursement Rate-(Gathering, Storage and/or Transportation).
38.6 Electric Power Reimbursement Deferral Rate:
38.6.1 The Electric Power Reimbursement Deferral Rate-
(Gathering, Storage and/or Transportation) shall be determined by
dividing the applicable balance accumulated in the Electric Power
Reimbursement Deferral Account-(Gathering, Storage and/or
Transportation), defined as the net cumulative balance for the
deferral period ending three (3) months prior to the effective
date of Transporter's annual filing described in Subsection 38.2,
by the applicable Projected Quantities.
38.6.2 Electric Power Reimbursement Deferral Account
38.6.2.1 Transporter shall establish and maintain
subaccounts of the Electric Power Reimbursement Deferral
Account-(Gathering, Storage and/or Transportation), as
applicable to accumulate under-recovered and/or over-
recovered electric power costs. The accumulated balance of
each deferral subaccount in Account No. 182.3 may include
the following: