GENERAL TERMS AND CONDITIONS (Continued)

 

38. FUEL REIMBURSEMENT ADJUSTMENT PROVISION (Continued)

 

38.5.2.1.1.3 Transporter shall then determine

the Gathering, Storage and/or Transportation

Fuel Use and Lost and Unaccounted For Gas

quantities recovered by multiplying the Fuel

Reimbursement Current Percentage-(Gathering,

Storage and/or Transportation) in effect, as

applicable, by the total actual quantity of

applicable gathering, storage and/or

transportation service during that month. The

monthly deferral amount shall be the difference

between the quantities derived in Subsections

38.5.2.1.1.1 or 38.5.2.1.1.2 and 38.5.2.1.1.3

herein, as applicable.

 

38.5.2.1.1.4 The Fuel Reimbursement Deferral

Account-(Gathering, Storage and/or

Transportation) balance shall be decreased or

increased, as applicable, each month by an

amount determined by multiplying the Fuel

Reimbursement Deferral Percentage-(Gathering,

Storage and/or Transportation), as applicable,

in effect each month by the applicable

gathering, storage and/or transportation

quantities of service during that month.

 

38.5.2.1.2 The gathering, storage and/or

transportation portion, as applicable, of all fuel

reimbursement related out-of-period adjustments.

 

38.6 Electric Power Reimbursement Current Rate:

 

38.6.1 The Electric Power Reimbursement Current Rate applicable

to gathering, storage and/or transportation service rendered shall

reflect the projected level of Transporter's system average cost

of electric power reimbursement per unit of relevant service

during the period the adjustment is to be in effect as specified

in Subsection 38.6.2 hereof.

 

38.6.2 The Electric Power Reimbursement Current Rate per unit

of gathering, storage and/or transportation service to be

recovered by Transporter during the six (6) month effective period

shall be calculated by dividing the projected total gathering,

storage and/or transportation function electric power costs, as

applicable, by the total Projected Quantities (i.e., Gathering

receipts, Storage injection and/or withdrawals or Transportation

receipts), as applicable, for the effective period.