Williston Basin Interstate Pipeline Co.
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 08/01/2003, Docket: RP03-286-004, Status: Effective
Fourth Revised Sheet No. 323A Fourth Revised Sheet No. 323A : Effective
Superseding: Third Revised Sheet No. 323A
GENERAL TERMS AND CONDITIONS (Continued)
38. FUEL AND ELECTRIC POWER REIMBURSEMENT ADJUSTMENT PROVISION (Continued)
38.5 Electric Power Reimbursement Current Rate:
38.5.1 The Electric Power Reimbursement Current Rate applicable
to gathering, storage and/or transportation service rendered shall
reflect the projected level of Transporter's system average cost
of electric power reimbursement per unit of relevant service
during the period the adjustment is to be in effect as specified
in Subsection 38.5.2 hereof.
38.5.2 The Electric Power Reimbursement Current Rate per unit
of gathering, storage and/or transportation service to be
recovered by Transporter during the six (6) month effective period
shall be calculated by dividing the projected total gathering,
storage and/or transportation function electric power costs, as
applicable, by the total Projected Quantities (i.e., Gathering
receipts, Storage injection and/or withdrawals or Transportation
receipts), as applicable, for the effective period.
38.5.2.1 The Electric Power Reimbursement Current Rate
per unit of contract storage service shall be determined by
first apportioning Transporter's projected storage cost of
electric power (Storage Electric Power Cost) for the
effective period to contract storage service (i.e.,
injections and/or withdrawals under Rate Schedules FS-1 and
IS-1) based on the ratio of the sum of projected contract
storage injections and/or withdrawals (Projected Contract
Storage Quantities) to the total of the projected system
storage (i.e., Transporter's storage injections and/or
withdrawals for maintenance of balancing and line pack) and
Projected Contract Storage Quantities. The Electric Power
Reimbursement Current Percentage per unit of contract
storage service shall then be calculated by dividing the
Storage Electric Power Cost apportioned to the contract
storage service by the applicable Projected Contract Storage
Quantities for the effective period to calculate the
Electric Power Reimbursement Current Rate-Storage.