Williston Basin Interstate Pipeline Co.
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 06/01/2007, Docket: RP07-431-000, Status: Effective
Fifth Revised Sheet No. 323 Fifth Revised Sheet No. 323 : Effective
Superseding: Fourth Revised Sheet No. 323
GENERAL TERMS AND CONDITIONS (Continued)
38. FUEL AND ELECTRIC POWER REIMBURSEMENT ADJUSTMENT PROVISION (Continued)
38.4.2.1.1.2 Transporter shall then determine
the actual monthly Transportation and System
Storage Fuel Use and Lost and Unaccounted For
Gas quantities applicable to transportation
(adjusted to include the offset described in
Subsections 18.2.8 and 15.5.2.1 of these General
Terms and Conditions).
38.4.2.1.1.3 Transporter shall then determine
the Gathering, Storage and/or Transportation
Fuel Use and Lost and Unaccounted For Gas
quantities recovered by multiplying the Fuel
Reimbursement Current Percentage-(Gathering,
Storage and/or Transportation) in effect, as
applicable, by the total actual quantity of
applicable gathering, storage and/or
transportation service during that month. The
monthly deferral amount shall be the difference
between the quantities derived in Subsections
38.4.2.1.1.1 or 38.4.2.1.1.2 and 38.4.2.1.1.3
herein, as applicable.
38.4.2.1.1.4 The Fuel Reimbursement Deferral
Account-(Gathering, Storage and/or
Transportation) balance shall be decreased or
increased, as applicable, each month by an
amount determined by multiplying the Fuel
Reimbursement Deferral Percentage-(Gathering,
Storage and/or Transportation), as applicable,
in effect each month by the applicable
gathering, storage and/or transportation
quantities of service during that month.
38.4.2.1.2 The gathering, storage and/or
transportation portion, as applicable, of all fuel
reimbursement related out-of-period adjustments.
(The rest of this sheet has been intentionally left blank.)