Williston Basin Interstate Pipeline Co.
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 05/05/2006, Docket: RP00-107-010, Status: Effective
Sixth Revised Sheet No. 252A.01 Sixth Revised Sheet No. 252A.01 : Effective
Superseding: Fifth Revised Sheet No. 252A.01
GENERAL TERMS AND CONDITIONS (Continued)
15. BALANCING AND NOMINATION VARIANCE PROCEDURES (Continued)
If the sum is negative (net MDDQ Unauthorized Overrun Penalty
revenues are less than net costs) Transporter shall carry over
such amount to the subsequent month and include it in such
subsequent month's calculation until Transporter is made whole.
The portion of any MDDQ Unauthorized Overrun Penalty revenues to
be credited to each Qualifying Shipper shall be based on the ratio
of each Qualifying Shipper's applicable monthly MDDQ to the total
of the Qualifying Shippers' monthly MDDQ for the month in which
the MDDQ Unauthorized Overrun Penalty obligation(s) is incurred.
The credit shall be applied to each Qualifying Shipper's monthly
bill issued three (3) months subsequent to the month the MDDQ
Unauthorized Overrun Penalty obligation(s) was paid.
15.16 Rate Schedule FT-1 quantities taken at a delivery point(s)
which exceed the applicable MDDQ, as adjusted pursuant to the CAP, by
more than the greater of two (2) percent or forty (40) dkt, will be
treated as MDDQ overruns and charged Transporter's Rate Schedule FT-1
authorized Scheduled Overrun Charge.
15.17 ADQ Unauthorized Overrun Penalties:
15.17.1 Rate Schedule FT-1 quantities taken at a delivery
point(s) which exceed the applicable ADQ, as adjusted pursuant to
the CAP, by more than one-half (.5) of one percent, and that have
not been authorized pursuant to Section 6 of Rate Schedule FT-1,
will be treated as ADQ Unauthorized Overruns and charged two (2)
times the currently effective Rate Schedule IT-1 rate during non-
critical periods or two (2) times the unauthorized overrun Index
Price during critical periods.
15.17.1.1 For purposes of this Subsection 15.17.1, the
maximum Rate Schedule IT-1 commodity base rate effective at
the beginning of the month the ADQ Unauthorized Overrun
Penalty is incurred shall be the penalty rate and shall be
treated as a final rate for ADQ Unauthorized Overrun Penalty
purposes.
15.17.1.2 The unauthorized overrun Index Price shall
consist of the arithmetic average of the posted index prices
in the "Inside FERC Gas Market Report" for Colorado
Interstate Gas Company (CIG-Rocky Mountains) and Northern
Natural Gas Company (Ventura, Iowa), as established for the
first day of the month following the month in which the ADQ
Unauthorized Overrun occurred.