Williston Basin Interstate Pipeline Co.
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 05/14/2010, Docket: RP10-602-000, Status: Effective
Seventh Revised Sheet No. 230 Seventh Revised Sheet No. 230
Superseding: Sixth Revised Sheet No. 230
GENERAL TERMS AND CONDITIONS (Continued)
9. NOMINATION AND SCHEDULING PROCEDURES (Continued)
9.22.2 Storage service performed under Transporter's Rate
Schedule FS-1, which shall be scheduled on a pro rata basis.
9.22.3 Storage service performed at the maximum lawful rate
under Rate Schedule IS-1. All such services shall be scheduled on
a pro rata basis.
9.22.4 Storage service performed at less than the maximum
lawful rate under Rate Schedule IS-1 shall be scheduled from the
highest rate to the lowest rate.
9.22.5 Scheduled authorized overrun storage services shall be
scheduled on a pro rata basis. Transporter shall offer all
available but unused storage capabilities on a daily basis and
make uncommitted storage capabilities available via an electronic
communication mechanism.
9.22.6 Storage service nominated and scheduled in accordance
with Subsection 9.10 after the nomination deadline(s) shall be
scheduled on a first come, first served basis.
9.23 The following interruption priority listing (in ascending order
of priority) shall prevail for storage services rendered pursuant to
Transporter's FERC Gas Tariff, Second Revised Volume No. 1:
9.23.1 Scheduled storage service nominated and scheduled in
accordance with Subsection 9.10 after the nomination deadline(s)
shall be interrupted from the lowest rate to the highest rate.
9.23.2 Scheduled authorized overrun storage service shall be
interrupted on a pro rata basis.