Williston Basin Interstate Pipeline Co.
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 07/30/2001, Docket: CP01-370-001, Status: Effective
Second Revised Sheet No. 227C Second Revised Sheet No. 227C : Effective
Superseding: First Revised Sheet No. 227C
GENERAL TERMS AND CONDITIONS (Continued)
9. NOMINATION AND SCHEDULING PROCEDURES (Continued)
9.14 Any Rate Schedule IT-1 and/or Rate Schedule IS-1 Shipper(s) that
is affected by the scheduling priority listing described in Subsections
9.20.4 and 9.22.4 of these General Terms and Conditions may, prior to
the Timely Nomination Cycle nomination deadline, request to increase its
rate level, up to the maximum lawful rate, in order to obtain a higher
scheduling priority for the following gas day. Such notice by Shipper
to Transporter must be received by Transporter, by facsimile, by the
Timely Nomination Cycle nomination deadline specified in Subsection 9.1
hereof. Shipper shall pay such higher rate through the end of the month
in which the higher scheduling priority is sought. Unless Shipper
notifies Transporter that it wishes to retain such higher rate level for
the term of its previously agreed to rate level, such higher rate level
shall revert to the previously agreed to rate level for the remaining
term of such rate level.
9.14.1 If on any day Transporter determines that Shipper will
not have all its gas scheduled for the following gas day due to
Shipper's rate level, Transporter will notify such Shipper by
telephone and/or facsimile by 4:30 p.m. Central Clock Time. In
order for such Shipper to obtain a higher scheduling priority for
the second following gas day, such Shipper must notify Transporter
of its agreement to pay a higher rate, up to the maximum lawful
rate. Such notice by Shipper to Transporter must be received by
Transporter, by facsimile, by the Timely Nomination Cycle
nomination deadline specified in Subsection 9.1 hereof. Shipper
shall pay such higher rate through the end of the month in which
the higher scheduling priority is sought. Unless Shipper notifies
Transporter that it wishes to retain such higher rate level for
the term of its previously agreed to rate level, such higher rate
level shall revert to the previously agreed to rate level for the
remaining term of such rate level.
(The rest of this sheet has been intentionally left blank.)