Williston Basin Interstate Pipeline Co.
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 06/02/2006, Docket: RP06-344-000, Status: Effective
Second Revised Sheet No. 186 Second Revised Sheet No. 186 : Effective
Superseding: First Revised Sheet No. 186
GENERAL TERMS AND CONDITIONS (Continued)
5. MEASUREMENT (Continued)
5.11 Correction of metering errors - failure of meters: In the event
a meter is out of service, or registering inaccurately, the volume
and/or quantity of gas gathered, transported, and/or stored shall be
determined:
5.11.1 By using the registration of any check meter or meters,
if installed and accurately registering; or, in the absence of
Subsection 5.11.1, then
5.11.2 By correcting the error if the percentage of error is
ascertainable by calibration, tests or mathematical calculation;
or in the absence of both Subsections 5.11.1 and 5.11.2, then
5.11.3 By estimating the volume and/or quantity based on
periods of similar conditions when the meter was registering
accurately.
5.11.4 Measurement data corrections should be processed within
six months of the production month with a three month rebuttal
period. This shall not apply in the case of deliberate omission
or misrepresentation or mutual mistake of fact. The parties'
other statutory, tariff and/or contractual rights shall not
otherwise be diminished by this provision.
5.12 Preservation of metering records: Transporter and Point
Operator shall each preserve, for a period of at least three years, all
test data, charts and other similar records.
6. SERVICE CONDITIONS
6.1 Properties and facilities: Unless otherwise agreed in writing,
Transporter shall only be responsible for the maintenance and operation
of its own properties and facilities and shall not be responsible for
the maintenance or operation of any other properties or facilities
connected in any way with the services to be performed pursuant to this
Tariff.
6.2 Alterations and repairs: Transporter shall have the right,
without liability to Shipper(s), to interrupt the gathering,
transportation, and/or storage of gas for Shipper(s), when necessary to
test, alter, modify, enlarge, or repair any facility