Williston Basin Interstate Pipeline Co.
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 09/01/2003, Docket: RP03-286-000, Status: Suspended
Fifth Revised Sheet No. 176 Fifth Revised Sheet No. 176 : Suspended
Superseding: Substitute Fourth Revised Sheet No. 176
GENERAL TERMS AND CONDITIONS (Continued)
1. DEFINITION OF TERMS (Continued)
1.12 The term "equivalent dkt" as used in this Tariff shall mean the
relevant capacity in Mcf converted to dkt using an assumed thermal
content of 1,000 BTU's per cubic foot.
1.13 The term "FERC" means the Federal Energy Regulatory Commission
or successor agency.
1.14 The term "Firm Cycle Quantity (FCQ)" means the maximum amount of
natural gas in equivalent dkt, as specified in Exhibit A to a Service
Agreement, which Transporter shall inject into and withdraw from storage
on a firm basis for Shipper during the injection and withdrawal seasons,
respectively.
1.15 The term "fuel reimbursement" consists of an allowance for the
following:
1.15.1 "Fuel Use" means the volume(s) of gas the Company uses
including, but not limited to, fuel used at compressor stations in
rendering the services hereunder.
1.15.2 "Lost and Unaccounted for Gas" means the volume(s) of
gas to compensate for lost or otherwise unaccounted-for gas on
Transporter's system.
1.15.3 "Electric Power Use" means the cost of electricity the
Company uses including, but not limited to, electricity used at
compressor stations in rendering the services hereunder.
1.16 The term "gathering service" means the acceptance by Transporter
of gas tendered by Shipper to Transporter at the point(s) of receipt
into Transporter's gathering facilities and the gathering of that gas
directly through Transporter's gathering facilities.
(The rest of this sheet has been intentionally left blank.)