Williston Basin Interstate Pipeline Co.
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 05/01/2003, Docket: RP03-323-000, Status: Effective
Fourth Revised Sheet No. 122 Fourth Revised Sheet No. 122 : Effective
Superseding: Third Revised Sheet No. 122
RATE SCHEDULE IS-1
INTERRUPTIBLE STORAGE SERVICE (Continued)
3. STORAGE SERVICE CHARGES
Distinct rates shall be charged for injection of gas into storage,
retention of gas in storage, and withdrawal of gas from storage for
Shipper's account under this Rate Schedule.
3.1 Applicable Rates: The applicable rates for service hereunder are
set forth on Sheet No. 20 of Transporter's Tariff, as it may be revised
from time to time. Such minimum and maximum rates shall not be
applicable to service provided pursuant to Section 51 of the General
Terms and Conditions of this Tariff.
3.2 For all storage service hereunder, Shipper shall pay Transporter
each month the sum of the following charges, as applicable:
3.2.1 Injection/Withdrawal Charge: Shipper shall be charged an
amount obtained by multiplying the unit injection charge and/or
the unit withdrawal charge set forth in the Service Agreement by
the quantity of gas in dkt injected into and/or withdrawn from
storage during the month.
3.2.2 Capacity Charge: Shipper shall, each month, be assessed
a capacity charge consisting of the product of Shipper's average
balance of gas held in storage during the month and the applicable
rate set forth in the Service Agreement.
3.3 Adjustment of Rates: Subject to the terms of the Service
Agreement, Transporter may prescribe and/or adjust at any time any of
the rates applicable to any individual Shipper without adjusting any
other rates for that or another Shipper; provided, however, that such
adjusted rate(s) shall not exceed the applicable maximum rate(s) nor
shall they be less than the
(The rest of this sheet has been intentionally left blank.)