Williston Basin Interstate Pipeline Co.
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 08/01/2003, Docket: RP03-286-004, Status: Effective
Sixth Revised Sheet No. 109A Sixth Revised Sheet No. 109A : Effective
Superseding: Fifth Revised Sheet No. 109A
RATE SCHEDULE FS-1
FIRM STORAGE SERVICE (Continued)
6. AUTHORIZED SCHEDULED OVERRUN STORAGE
Upon request of Shipper and at Transporter's option, Transporter may
receive for injection and/or withdrawal for Shipper's account, on any
day, quantities of gas in excess of the MSIQ and/or MSDQ shown in
Exhibit A to Shipper's Service Agreement, each as adjusted pursuant to
the CAP. Such quantities shall be injected and/or withdrawn on an
interruptible basis. For such excess gas injected and/or withdrawn,
Shipper shall pay an amount obtained by multiplying the quantity of such
excess gas during the month by the Scheduled Overrun Charge.
7. FUEL AND ELECTRIC POWER REIMBURSEMENT
Shipper shall reimburse Transporter in-kind for fuel use, lost and
unaccounted for gas and in-dollars for electric power use in accordance
with Subsection 1.15 and Section 38 of the General Terms and Conditions.
The Total Fuel Reimbursement Percentage per dkt and Total Electric Power
Reimbursement Rate per dkt, as applicable, shall be applied to the
quantities of gas injected and/or withdrawn, as applicable, by
Transporter for Shipper's account at Transporter's storage facilities.
(The rest of this sheet has been intentionally left blank.)