Williston Basin Interstate Pipeline Co.
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 03/16/2000, Docket: RP00-180-000, Status: Effective
First Revised Sheet No. 106A First Revised Sheet No. 106A : Effective
Superseding: Original Sheet No. 106A
RATE SCHEDULE FS-1
FIRM STORAGE SERVICE (Continued)
2. APPLICABILITY AND CHARACTER OF SERVICE (Continued)
2.5 Any Shipper contracting for service under this Rate
Schedule shall be required to cycle annually at least eighty
percent of its Firm Cycle Quantity (FCQ), as adjusted to reflect
the weighted average of the actual Btu content of gas held in
storage for such Shipper, set forth in the Service Agreement.
Shipper(s) not cycling at least eighty percent shall be required
to pay withdrawal and injection charges, exclusive of the storage
fuel use, lost and unaccounted for gas charge, under this Rate
Schedule for that portion of the eighty percent of such FCQ not
cycled.
(The rest of this sheet has been intentionally left blank.)