Williston Basin Interstate Pipeline Co.
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 09/01/2003, Docket: RP03-286-000, Status: Suspended
Fourth Revised Sheet No. 93 Fourth Revised Sheet No. 93 : Suspended
Superseding: Third Revised Sheet No. 93
RATE SCHEDULE IT-1
INTERRUPTIBLE TRANSPORTATION SERVICE (Continued)
6. FUEL AND ELECTRIC POWER REIMBURSEMENT (Continued)
The Total Fuel Reimbursement Percentage per dkt and Total Electric Power
Reimbursement Rate per dkt, as applicable, shall be applied to the
quantities of gas tendered to Transporter for Shipper's account at the
receipt point(s) into Transporter's gathering and/or transmission
facilities, as applicable.
7. CONDITIONS OF SERVICE
7.1 To qualify for service pursuant to this Rate Schedule, a
potential Shipper shall make a request for transportation service
pursuant to the provisions of Section 7 of the General Terms and
Conditions.
7.2 Shipper shall have sole responsibility for all arrangements
necessary for delivery of natural gas to Transporter at the receipt
point(s) for transportation, and for all arrangements necessary for the
receipt of gas at the delivery point(s).
7.3 Shipper may be required periodically to update the credit
information originally provided in the Transportation/Storage Service
Request Form.
(The rest of this sheet has been intentionally left blank.)