Williston Basin Interstate Pipeline Co.
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 05/01/2003, Docket: RP03-323-000, Status: Effective
Third Revised Sheet No. 49 Third Revised Sheet No. 49 : Effective
Superseding: Second Revised Sheet No. 49
RATE SCHEDULE FTN-1
NO-NOTICE FIRM TRANSPORTATION SERVICE (Continued)
3. TRANSPORTATION SERVICE CHARGES (Continued)
3.2 Reservation Charge: Shipper shall, each month, be assessed a
reservation charge consisting of Shipper's MDDQ multiplied by the MDDQ
charge set forth in the Service Agreement. Shipper shall be responsible
for paying the reservation charge beginning on the effective date
provided in Section 7 of the Service Agreement.
3.3 Adjustment of Rates: Subject to the terms of the Service
Agreement, Transporter may prescribe and/or adjust at any time any of
the rates applicable to any individual Shipper without adjusting any
other rates for that or another Shipper; provided, however, that such
adjusted rate(s) shall not exceed the applicable maximum rate(s) nor
shall they be less than the applicable minimum rate(s) set forth on
Sheet No. 17 of this Tariff, or any superseding tariff. Such minimum
and maximum rates shall not be applicable to service provided pursuant
to Section 51 of the General Terms and Conditions of this Tariff.
Downward adjustment to any rate shall be for a specific term. Unless
otherwise agreed, at the expiration of the stated term specified in
Exhibit "D" of the Service Agreement, the rate for transportation
service shall be the maximum allowable rate under this Rate Schedule.
3.4 In addition to the rates applicable hereunder, Shipper shall be
responsible for the appropriate Rate Schedule FS-1 Injection/Withdrawal
charge(s), as well as all Rate Schedule FT-1 transportation charges
associated with the gas utilized to provide the actual level of no-
notice service provided hereunder as detailed in Sections 2.3 and 2.4
hereof.
4. MINIMUM MONTHLY BILL
The minimum monthly bill shall be the Reservation Charge.
5. RESERVATION CHARGE ADJUSTMENT
If Transporter, on any day, fails to deliver to Shipper the quantity of
gas described in Section 2.3.6 of this Rate Schedule, the reservation
charge for the month in which such day occurs will be reduced by an
amount equal to the volume of gas that Transporter failed to deliver on
such day, multiplied by a unit amount per equivalent dkt obtained by
dividing the applicable MDDQ reservation rate by the number of days in
such month. Such unit amount shall be