Williston Basin Interstate Pipeline Co.
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 06/01/1997, Docket: RP97-352-000, Status: Effective
Third Revised Sheet No. 46 Third Revised Sheet No. 46 : Effective
Superseding: Second Revised Sheet No. 46
RATE SCHEDULE FTN-1
NO-NOTICE FIRM TRANSPORTATION SERVICE (Continued)
2. APPLICABILITY AND CHARACTER OF SERVICE (Continued)
below the daily nominated and scheduled quantity of firm
transportation service provided under Rate Schedule FT-1 up to
the Maximum Daily Delivery Quantity (MDDQ) specified for that
delivery point in Exhibit A to the Service Agreement under this
Rate Schedule FTN-1, as adjusted pursuant to the Capacity
Adjustment Provision (CAP) (described in Subsection 1.47 of the
General Terms and Conditions of this Tariff). Provided,
however, that Transporter shall not be required to execute a
Service Agreement under this Rate Schedule for an MDDQ that
exceeds Shipper's MDDQ under the corresponding Rate Schedule
FT-1 Service Agreement.
2.2 It is recognized that the availability of gas supply is
critical to the service to be provided hereunder. Therefore,
to obtain service hereunder, Shipper must also contract for
firm contract storage service under Rate Schedule FS-1
specifying a Maximum Storage Deliverability Quantity (MSDQ)
such that the ratio of Shipper's Rate Schedule FS-1 MSDQ to
Shipper's Rate Schedule FTN-1 MDDQ is at least equivalent to
the ratio of the total Rate Schedule FS-1 MSDQ available when
Transporter's Tariff became effective to the total sales
service MDQ used to initially allocate such total Rate Schedule
FS-1 MSDQ in accordance with Subsection 1.4 of Rate Schedule
FS-1.
2.3 For no-notice service above the daily nominated and scheduled
quantity of firm transportation service.
2.3.1 To the extent that the MDDQ specified for service under
Rate Schedule FTN-1 exceeds Shipper's Rate Schedule FS-
1 MSDQ, Shipper shall be required to have in place a
supply contract(s) which is capable of making available
an amount of natural gas equal to the amount of the
difference between Shipper's Rate Schedule FTN-1 MDDQ
and Shipper's Rate Schedule FS-1 MSDQ. The supply
contract(s) must specify a receipt point(s) on
Transporter's system within Shipper's existing contract
path specified in the Rate Schedule FT-1 Service
Agreement.
2.3.1.1 The Service Agreement shall specify such
supply contract(s), the applicable receipt