GENERAL TERMS AND CONDITIONS

(Continued)

 

(4)The Intraday 2 Nomination Cycle: 5:00 p.m. for nominations

leaving control of the nominating party; 5:15 p.m. for receipt of

nominations by SGRM (including from TTTSPs); 5:30 p.m. to send

Quick Response; 8:00 p.m. for receipt of completed confirmations

by SGRM from upstream and downstream connected parties; 9:00 p.m.

for SGRM to provide scheduled quantities to affected Customers and

point operators, and to provide scheduled quantities to bumped

parties (notice to bumped parties) (Central Clock Time on the

Day). Scheduled quantities resulting from Intraday 2 Nominations

should be effective at 9:00 p.m. on the Day. Bumping is not

allowed during the Intraday 2 Nomination Cycle.

 

8.3 Customer shall make available and tender any Gas to

be injected or wheeled hereunder and receive and accept delivery,

upon tender by SGRM, any Gas requested to be withdrawn from

storage or wheeled. The quantity of Gas stored for the account of

Customer shall be increased or decreased upon injection or

withdrawal of Gas from storage, as applicable. Customer shall not

(unless otherwise agreed by SGRM) receive or deliver Gas, nor

shall SGRM be obligated to receive Gas or deliver Gas on an hourly

basis at rates of flow in excess of 1/24 of Customer's MDRQ or

MDDQ, respectively. As determined by SGRM in its sole and

reasonable judgment, flow rates above 1/24 of Customer's MDRQ or

MDDQ may be permitted. A Customer shall not be permitted to

nominate simultaneous injections to and withdrawals from storage.

 

9. POINT(S) OF RECEIPT AND POINT(S) OF DELIVERY

 

9.1 Point(s) of Receipt. Customer shall tender all Gas

for wheeling or injection into storage to SGRM at the Point(s) of

Receipt as specified in Customer's Storage Service Agreement. The

quantity of Gas tendered by Customer to SGRM for wheeling or

injection into storage shall (i) not exceed at each Point of

Receipt the MDTQ or MDRQ, as applicable, for such Point of Receipt

in effect from time to time, or (ii) not exceed the MDIQ plus the

applicable Fuel Reimbursement at all Point(s) of Receipt in effect

from time to time, without the consent of SGRM.

 

9.2 Point(s) of Delivery. SGRM shall tender all Gas to

be wheeled or withdrawn from storage to Customer at the Point(s)

of Delivery as specified in Customer's Storage Service Agreement.

The quantity of Gas delivered to Customer shall (i) not exceed at

each Point of Delivery the MDTQ or MDDQ, as applicable, for such

Point of Delivery in effect from time to time, or (ii) not exceed

the MDWQ at all Point(s) of Delivery in effect from time to time,

without the consent of SGRM.

 

9.3 Transportation Guidelines. For each Point of Receipt

and Point of Delivery, the interconnected Transporter's rules,

guidelines, operational procedures and policies, as they may be

changed from time to time, shall define and control the manner in

which Gas is delivered or received. SGRM and Customer each agree

to provide to the other, in as prompt a manner as reasonable,