Nora Transmission Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 06/01/1997, Docket: RP97-105-001, Status: Effective
First Revised Sheet No. 148 First Revised Sheet No. 148 : Superseded
Superseding: Original Sheet No. 148
GENERAL TERMS AND CONDITIONS (Continued)
b. A bid may be withdrawn after it is received by the
Pipeline in writing or on the Pipeline's electronic
communication system at any time up to the last day of the
bidding period, however no bid can be withdrawn after the
bidding period. Any bid received by the Pipeline during the
bidding period shall be legally binding on the Bidder unless
withdrawn by the Bidder. Once a Bidder withdraws a bid, it
cannot submit a subsequent bid for the same released
capacity unless the subsequent bid is for an equal or higher
rate than the original bid. To be considered, a bid must
satisfy the minimum terms imposed by the Releasing Customer.
25.8 Awarding of Released Capacity
a. Released capacity shall be made available on a
nondiscriminatory basis in accordance with the procedures
described herein. Pipeline will evaluate all
bids received between 2:00 p.m. CCT and 3:00 p.m. CCT on
the day the bidding period ends, and select the bid which
will receive the released capacity. Initially, Pipeline
will eliminate from consideration those bids which do not
meet the minimum conditions established by the Releasing
Customer and those bids which have not complied with
Pipeline's own creditworthiness criteria. If the
Releasing Customer has provided criteria for determining
the "best bid", Pipeline will apply those criteria to
determine which bid receives the capacity. The Pipeline is
only required to meet the capacity release timeline for
processing capacity reallocation if the Releasing
Customer's "best bid" is defined as that bid which
generates (1) the highest value, (2) the maximum net
revenue, or (3) the highest present value. If multiple
bids have been submitted meeting minimum conditions,
Pipeline shall award the bids, best bid first, until all
offered capacity is awarded. If no evaluation criteria
have been provided by the Releasing Customer, Pipeline
will award the released capacity based on the application
of the following criteria:
(i) If there is only one valid bid, Pipeline will award
the released capacity to that Bidder;
(ii) If more than one valid bid is received, Pipeline
will award the released capacity to the Bidder
offering the maximum applicable rate for the maximum