Quest Pipelines (Kpc)

Second Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 10/01/2009, Docket: RP09-1019-000, Status: Effective

First Revised Sheet No. 106 First Revised Sheet No. 106

Superseding: Original Sheet No. 106

 

GENERAL TERMS AND CONDITIONS

 

1.11 Electronic Gas Measurement (EGM) shall mean that form of

measurement equipment which may consist of a computerized remote

terminal unit, transducers and other associated power, radio,

sensing and other electronic devices to accomplish Gas measurement

and transfer of data, without the use of charts.

 

1.12 Electronic Funds Transfer shall mean payments made or effected by

wire transfer (Fedwire, CHIPS, or Bank Book Entry) or Automated

Clearing House (ACH) or any other recognized electronic or

automated payment mechanism that is agreed upon by Shipper and KPC

in the future.

 

1.13 Elapsed Prorata Capacity shall mean that portion of the capacity

that would have theoretically been available for use prior to the

effective time of the intraday recall based upon a cumulative

uniform hourly use of the capacity.

 

1.14 Firm Rate Schedule shall mean an agreement for Transportation

Service provided under either Rate Schedules FT, FT-NN, SCT, SCT-

NN or approved non-conforming service agreements.

 

1.15 Fuel Reimbursement shall mean the reimbursement of KPC by Shipper

in kind for fuel usage and lost or unaccounted for Gas.

 

1.16 IEC System shall mean the Internet Electronic Communication System

offered by KPC on a nondiscriminatory basis to any Party or

Shipper that has access to the internet, and provided that such

Shipper has been assigned a USER ID and password and agrees to

comply with the procedures for proprietary access to the IEC

System and with the procedures for use of the IEC System.

 

1.17 Reserved for future use.

 

1.18 Long-Term Agreement shall mean a Transportation or Sales Agreement

with a primary term of one year or more from the effective date of

the Agreement.

 

1.19 Flow Control Device shall mean a physical valve at a Point of

Receipt or Point of Delivery on KPC's pipeline which provides KPC

with control over flowing volumes at that point.

 

1.20 Maximum Daily Contract Quantity (MDCQ) shall mean the maximum

Quantity of Gas which KPC is obligated to deliver on any Day at a

Point of Delivery to Shipper as specified in an executed

Transportation Agreement.