Quest Pipelines (Kpc)

Second Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index



Effective Date: 04/01/2010, Docket: RP10-394-000, Status: Effective

First Revised Sheet No. 84 First Revised Sheet No. 84

Superseding: Original Sheet No. 84







Unless KPC and Shipper execute a Negotiated Rate Agreement pursuant to

Section 26 of the General Terms and Conditions of this Tariff, the rates

and charges for interruptible service under this Rate Schedule shall be

as follows:


3.1 Transmission Charge


If Shipper designates interruptible Point(s) of Receipt or

interruptible Point(s) of Delivery on the transmission portion of

KPC's system, Shipper shall pay a Transmission Charge which shall

be the product of the actual Quantity of Gas delivered during the

Month times the Transmission commodity rates per Dt. as set forth

on the effective Tariff Sheet No. 47. If the Point(s) of Receipt

and the Point(s) of Delivery are located in different zones, the

applicable rates shall be derived by adding the effective rates

for service in the multiple Zones.


3.2 Surcharges


Shipper shall pay all surcharges specified in the General Terms

and Conditions or which otherwise may be applicable to service

under this Rate Schedule from time to time.


3.3 Range of Rates


Any rate applicable to a Shipper for service hereunder, by

reference to the effective Tariff Sheet Nos. 47 and 48 shall be

the applicable Maximum Rate(s) set forth thereon.


3.4 Fuel Reimbursement


Shipper shall reimburse KPC in kind for fuel Usage and lost or

unaccounted for Gas pursuant to the terms and conditions of the

Service Agreement and as stated on the effective FERC Tariff Sheet

No. 57 for service hereunder.