Quest Pipelines (Kpc)
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 02/01/2008, Docket: RP08-174-000, Status: Effective
Original Sheet No. 66 Original Sheet No. 66 : Effective
RATE SCHEDULE FT-NN (continued)
FIRM TRANSPORTATION, NO NOTICE SERVICE
of Gas as it desires or as are consistent with available pipeline
pressures at each Point(s) of Delivery as long as such Quantities of Gas
are being delivered to KPC by Shipper at each Primary and Secondary
Point(s) of Receipt. KPC shall be entitled to require Shipper to
restrict takes of Natural Gas at any point during any hour by notifying
Shipper of issuance of an Operational Flow Order or an Extreme Condition
through the EBB System and telephone or facsimile communications.
6. RESERVATIONS
KPC reserves the right from time to time to unilaterally make any
changes to, or to supersede, the rates and charges and other terms in
this Rate Schedule and the other provisions of KPC's FERC Gas Tariff,
and the applicability thereof, subject to the provisions of the Natural
Gas Act and the Commission's Regulations thereunder.
7. GENERAL TERMS AND CONDITIONS
The General Terms and Conditions of KPC's FERC Gas Tariff are applicable
to this Rate Schedule and are hereby made a part hereof.