Quest Pipelines (Kpc)

Second Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 02/01/2008, Docket: RP08-174-000, Status: Effective

Original Sheet No. 63 Original Sheet No. 63 : Effective

 

RATE SCHEDULE FT-NN (continued)

FIRM TRANSPORTATION, NO NOTICE SERVICE

 

(a) The reservation component of the Transmission Charge shall

be the product of the MDCQ times the applicable Transmission

reservation rates per Dt. as set forth on the effective

Tariff Sheet Nos. 37 and 38. The reservation component

shall be pro-rated for the first and last contract Months to

adjust for the number of Days during those Months service

was available.

 

(b) The commodity component of the Transmission Charge shall be

the product of the actual Quantity of Gas delivered during

the Month times the applicable Transmission commodity rates

per Dt. as set forth on the effective Tariff Sheet Nos. 37

and 38.

 

(c) If both the Point(s) of Receipt or a Point(s) of Delivery

are located within the same Zone, the applicable rates shall

be as set forth on the effective Tariff Sheet Nos. 37 and 38

for service within the same Zone only; if the Point(s) of

Receipt or a Point(s) of Delivery are located in different

Zones, the applicable rates shall be derived by adding the

effective rates for service in the multiple Zones.

 

3.2 ACA and Other Charges

 

Shipper shall pay all ACA and Other Charges specified in the

General Terms and Conditions or which otherwise may be applicable

to service under this Rate Schedule from time to time.

 

3.3 Overrun Charges

 

(a) Overrun Charge for Takes in Excess of MDCQ

 

If during one or more Days in the billing Month Shipper

takes Quantities of Gas in excess of the applicable Maximum

Daily Contract Quantity as stated in the Service Agreement

(hereinafter called overrun quantities) for firm service