Kinder Morgan Interstate Gas Transmission LLC
Second Revised Volume No. 1-D
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/28/1999, Docket: GT00- 19-000, Status: Effective
Original Sheet No. 36 Original Sheet No. 36 : Effective
GENERAL TERMS AND CONDITIONS FOR SERVICES - continued
g. BALANCING. A Shipper transporting gas from a physical
receipt point to the Aggregation Pool shall be responsible
for any imbalance which occurs between the Receipt Point and
the Aggregation Pool. A Shipper transporting gas from the
Aggregation Pool to a physical Delivery Point shall be
responsible for all imbalances which occur between the
Aggregation Pool and the Delivery Point.
22.6 SCHEDULING PRINCIPLES
a. The order for scheduling transportation services is as
follows:
(1) Firm transportation at primary points (scheduled pro
rata based on nominations);
(2) Firm transportation at secondary points utilizing
primary path (scheduled pro rata based on
nominations);
(3) Firm transportation at secondary points not utilizing
primary path (scheduled pro rata based on
nominations);
(4) Interruptible transportation at maximum rates
(scheduled pro rata based on nominations);
(5) Interruptible transportation at less than maximum
rates (scheduled by rate);
(6) Firm transportation overrun (scheduled pro rata based
on nominations);
(7) Interruptible transportation overrun (scheduled pro
rata based on nominations).
b. Released capacity has the same priority as non-released
capacity.
Released FT-BW is considered firm service.
Firm Intra-day Nominations are entitled to bump scheduled
interruptible volumes only during the Evening and
Intra-day 1 Nomination Cycles, as defined in Section 6.1.
Firm intra-day nominations are not entitled to bump already
scheduled firm volumes.