Kinder Morgan Interstate Gas Transmission LLC
Fourth Revised Volume No. 1-B
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/28/1999, Docket: GT00- 19-000, Status: Effective
Original Sheet No. 66 Original Sheet No. 66 : Effective
GENERAL TERMS AND CONDITIONS FOR SERVICES - continued
(2) Ten percent (10%) of such Gas Supply
Realignment Costs shall be reflected in
revised rates for Rate Schedule IT service
which shall be designed to recover over the
following twelve (12) months said ten percent
(10%) of Transporter's Gas Supply Realignment
Costs. A portion of the Rate Schedule IT
revenue as determined pursuant to Section
26.3 d. shall be credited to the recovery of
Gas Supply Realignment Charges collected by
Transporter.
(3) Any Gas Supply Realignment Costs actually
incurred and recovered from Shippers under
Rate Schedules FT and NNS but subsequently
required by the Commission to be refunded
shall be refunded to such Shippers within
sixty (60) days after the date of the
Commission order requiring such refunds on
the ratio of the Shipper's aggregate MDQ to
the total aggregate MDQ under Rate Schedules
FT and NNS for the time period during which
the Gas Supply Realignment Costs were
allocated. Any Gas Supply Realignment Costs
actually incurred and deemed recovered from
Shippers under Rate Schedule IT shall be
credited to the Gas Supply Realignment Costs
to be included in the rates for Rate Schedule
IT in the next quarterly filing.
c. Within sixty (60) days from each twelve (12) month
period following the implementation date,
Transporter shall file a statement with the
Commission reflecting:
(1) The aggregate amount of Gas Supply
Realignment Costs incurred and allocated to
be collected during the previous twelve (12)
month period from Rate Schedule IT, as
determined pursuant to Section 26.3 d.;