Kinder Morgan Interstate Gas Transmission LLC
Fourth Revised Volume No. 1-B
Contents / Previous / Next / Main Tariff Index
Effective Date: 06/01/2004, Docket: CP03- 39-001, Status: Effective
Third Revised Sheet No. 49 Third Revised Sheet No. 49 : Effective
Superseding: Second Revised Sheet No. 49
GENERAL TERMS AND CONDITIONS FOR SERVICES - continued
subsequent deadlines set forth in this Section 23, but Transporter
shall make a reasonable attempt to adhere to such deadlines.
Transporter shall publish standards relating to such computer
diskettes, but it is the responsibility of the Releasing Shipper to
develop and provide the working computer diskette. The Releasing
Shipper shall warrant that the computer diskette conforms to the bid
evaluation procedure in the Capacity Release Request.
(b) The term of any release of capacity sought under
this Section 23 shall be at least one full day and shall not exceed
the remaining term of the Eligible Firm Transportation Agreement.
(c) The quantity sought to be released under a
Capacity Release Request shall not be less than one hundred (100) Dth
per Day.
(d) (1) No capacity release under this Section 23
shall result in an increase in the total capacity set forth in the
Eligible Firm Transportation Agreement with the Original Shipper for
any segment of a path covered by such Eligible Firm Transportation
Agreement. In the event a path is segmented by a capacity release
under this Section 23, the upstream path segment shall receive all
secondary points upstream of the break point and the downstream path
segment shall receive all secondary points downstream of the break
point. The direction of "forward" flow for path segments must be the
same direction of "forward" flow for the original path. The
Replacement Shipper may nominate service at Receipt and Delivery
Points for the path segment that result in a reverse flow from the
original path; however, such service will be treated as being outside
of the path as provided in Section 3 of Rate Schedules FTS and NNS
in Volume 1-A.
(2) The commodity and reservation charges
applicable to deliveries to and from newly created path endpoints as a
result of a path release shall be determined in accordance with
Section 3 of Rate Schedules FTS, NNS, FSS, CMC-1 and CMC-2 in Volume
1-A; provided, however, that the bid may exceed the maximum
reservation charge through September 30, 2002, to the extent the rate
ceilings have been waived for released capacity contracts of less than
one (1) year pursuant to 18 C.F.R. Section 284.8(i).