Kinder Morgan Interstate Gas Transmission LLC
Fourth Revised Volume No. 1-B
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/28/1999, Docket: GT00- 19-000, Status: Effective
Original Sheet No. 16 Original Sheet No. 16 : Effective
GENERAL TERMS AND CONDITIONS FOR SERVICES - continued
5.4 The components for determining the deviation from
Boyle's Law, at the pressure and temperature under
which delivered, shall be determined by tests at
intervals of twelve (12) months or at such shorter
interval as is found necessary in practice and the
correction factor so determined using American Gas
Association "Report Number Eight" or American Gas
Association "Project NX-19" shall be used in the
computation of deliveries until the next test.
5.5 The heating value of the gas delivered shall be
determined by approved recording calorimeters,
chromatographs, continuous samplers, or other
instruments, installed by Transporter at points on
Transporter's pipeline system.
5.6 The cutoff for the closing of measurement is five
(5) business days after business month.
6. MEASURING EQUIPMENT
6.1 Transporter and Shipper shall agree regarding
arrangements for installation, ownership, operation
and maintenance at or near Points of Receipt and
Points of Delivery of measuring equipment,
including heating value measuring equipment and
telemetering equipment, which shall meet the
qualifications set out in the General Terms and
Conditions of Transporter's FERC Gas Tariff.
6.2 If Shipper installs, maintains, or operates
measuring equipment, such actions shall be pursuant
to the specifications set forth in the General
Terms and Conditions of Transporter's FERC Gas
Tariff. Transporter shall not be obligated to
install such measuring equipment.
6.3 Shipper may install, operate and maintain, at its
own expense, such check measuring equipment as it
shall desire, provided that such check meters and
equipment shall be so installed as not to interfere
with the operation of Transporter's meters at or
near the Point of Delivery. Transporter shall have
access to such check measuring equipment at all
reasonable hours but the reading, calibrating and
adjusting thereof and changing of charts shall be
done only by Shipper.