Kinder Morgan Interstate Gas Transmission LLC

Fourth Revised Volume No. 1-A

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 06/01/2004, Docket: CP03- 39-001, Status: Effective

Original Sheet No. 178A Original Sheet No. 178A : Effective

 

RATE SCHEDULE CMC-2 (Continued)

 

5.1 Subject to Section 36 of the General Terms and Conditions of this

Tariff, Shipper shall pay Transporter each month under this Rate

Schedule CMC-2 the sum of the following amounts:

 

(a) a Transportation Reservation Charge, which shall equal the

result of the Shipper's MSV divided by 12 multiplied by the

Transportation Reservation Rate;

 

(b) a Transportation Commodity Charge, which shall equal the

Transportation Commodity Rate multiplied by each Dth of gas

(net of fuel) delivered;

 

(c) a Storage Deliverability Reservation Charge, which shall

equal the result of the Shipper's MSV divided by 12

multiplied by the Storage Deliverability Reservation Rate;

 

(d) a Storage Capacity Reservation Charge, which shall equal

result of the Shipper's MSV divided by 12 multiplied by the

Storage Capacity Reservation Rate;

 

(e) a Storage Injection Charge, which shall equal the Storage

Injection Rate multiplied by the volume in Dth of gas

injected by Transporter;

 

(f) a Storage Withdrawal Charge, which shall equal the Storage

Withdrawal Rate multiplied by the volume in Dth of gas

withdrawn by Transporter; and

 

(g) any Overrun charge, if applicable.