Original Sheet No. 158A Original Sheet No. 158A : Effective
RATE SCHEDULE CMC-1 (continued)
5.1 Subject to Section 36 of the General Terms and Conditions of this
Tariff, Shipper shall pay Transporter each month under this Rate
Schedule CMC-1 the sum of the following amounts:
(a) a Transportation Reservation Charge, which shall equal the
result of the Shipper's MSV divided by 12 multiplied by the
Transportation Reservation Rate;
(b) a Transportation Commodity Charge, which shall equal the
Transportation Commodity Rate multiplied by each Dth of gas
(net of fuel) delivered;
(c) a Storage Deliverability Reservation Charge, which shall
equal the result of the Shipper's MSV divided by 12
multiplied by the Storage Deliverability Reservation Rate;
(d) a Storage Capacity Reservation Charge, which shall equal
result of the Shipper's MSV divided by 12 multiplied by the
Storage Capacity Reservation Rate;
(e) a Storage Injection Charge, which shall equal the Storage
Injection Rate multiplied by the volume in Dth of gas
injected by Transporter;
(f) a Storage Withdrawal Charge, which shall equal the Storage
Withdrawal Rate multiplied by the volume in Dth of gas
withdrawn by Transporter; and
(g) any Overrun charge, if applicable.