Kinder Morgan Interstate Gas Transmission LLC
Fourth Revised Volume No. 1-A
Contents / Previous / Next / Main Tariff Index
Effective Date: 08/01/2004, Docket: RP04-336-000, Status: Effective
Second Revised Sheet No. 73 Second Revised Sheet No. 73 : Effective
Superseding: Original Sheet No. 73
RATE SCHEDULE NNS - continued
5. RATES
5.1 RATES. The applicable rates, including any surcharges, for No-
Notice Service are set forth in Volume 1-A of this FERC Gas
Tariff, as revised from time to time. Unless otherwise agreed in
writing between Transporter and Shipper under Section 36 of the
General Terms and Conditions, the applicable rate shall not be in
excess of the maximum rate nor less than the minimum rate. Fuel
reimbursement quantity set forth on the applicable rate sheet of
Transporter's Tariff, shall be charged prior to injection of gas
into storage. The commodity rate applicable to NNS shall be
charged on withdrawal of the gas from storage.
5.2 MONTHLY BILL. Commencing for the month in which the NNS Agreement
is effective and each month thereafter, Transporter shall charge
and Shipper shall pay Transporter the sum of the following
amounts:
a. RESERVATION CHARGE. The reservation charge shall be the
product of:
(1) the Maximum Reservation Rate as stated on the
applicable rate sheet in this Tariff for each Primary
Path, unless otherwise agreed to in writing; provided,
if Shipper nominates Secondary Receipt and/or Delivery
Point(s) and the Maximum Reservation Rate of the path
nominated is greater than the Maximum Reservation Rate
of the Primary Path, Shipper will be billed the
difference in the Maximum Reservation Rates for the
applicable period and quantities, unless otherwise
agreed to in writing; and
(2) the MDDQ specified by Primary Path in Shipper's NNS
Agreement.