Kinder Morgan Interstate Gas Transmission LLC
Fourth Revised Volume No. 1-A
Contents / Previous / Next / Main Tariff Index
Effective Date: 02/01/2010, Docket: RP10-301-000, Status: Effective
Second Revised Sheet No. 4F Second Revised Sheet No. 4F
Superseding: First Revised Sheet No. 4F
Maximum Minimum Maximum
Reservation Commodity Commodity
Rate Schedule Rate 1/ Rate 2/ Rate 2/
CMC-1 6/
Transportation $0.3342 $0.0094 $0.0094
Storage:
Deliverability $0.2593 - -
Capacity $0.2593 - -
Injection - $0.0049 $0.0049
Withdrawal - $0.0049 $0.0049
Authorized Overrun Rate 5/ - $0.0338 $0.6537
FL&U Rate 3/ - 3.2% 3.2%
FL&U Rate 4/ - 1.2% 1.2%
CMC-2 6/
Transportation $0.3501 $0.0094 $0.0094
Storage:
Deliverability $0.2740 - -
Capacity $0.2740 - -
Injection - $0.0049 $0.0049
Withdrawal - $0.0049 $0.0049
Authorized Overrun Rate 5/ - $0.0338 $0.6537
FL&U Rate 3/ - 3.2% 3.2%
FL&U Rate 4/ - 1.2% 1.2%
CMC-2 (Huntsman 2009 Expansion Project) 6/
Transportation $0.1984 $0.0094 $0.0094
Storage:
Deliverability $1.0558 - -
Capacity $1.0558 - -
Injection - $0.0049 $0.0049
Withdrawal - $0.0049 $0.0049
Authorized Overrun Rate 5/ - $0.0143 $2.3243
FL&U Rate 3/ - 3.2% 3.2%
FL&U Rate 4/ - 1.2% 1.2%
Unauthorized Overrun Charge of $6.00 per Dth shall apply in addition to the above stated charges.
1/ Reservation Rates are stated per Dth of Maximum Storage Volume (MSV).
2/ Commodity, Injection, Withdrawal and Authorized Overrun Rates are $/dth.
Remainder of footnotes on following page.