Trailblazer Pipeline Company

Third Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 01/01/1996, Docket: RP96- 71-000, Status: Effective

First Revised Sheet No. 310 First Revised Sheet No. 310 : Superseded

Superseding: Substitute Original Sheet No. 310

 

EXHIBIT B

DATED ............

 

 

 

Company:

 

Contract No.:

 

Delivery Point(s):

 

 

MDQ

Name / Location PIN No. (MMBtu)

----------------------------------------------- ------- -------

 

PRIMARY DELIVERY POINT(S):

 

1. ........................................... ....... .......

...........................................

...........................................

...........................................

 

SECONDARY DELIVERY POINT(S):

 

2. ........................................... ....... .......

...........................................

...........................................

...........................................

 

 

 

 

 

 

 

 

 

 

Delivery Pressure, Assumed Atmospheric Pressure

-----------------------------------------------

 

Natural gas to be delivered by Trailblazer to Shipper, or for

Shipper's account, at the Delivery Point(s) shall be at the pressures

available in Trailblazer's pipeline facilities from time to time. The

measuring party shall use or cause to be used an assumed atmospheric

pressure corresponding to the elevation at such Delivery Point(s).