Trailblazer Pipeline Company
Third Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 01/01/1996, Docket: RP96- 71-000, Status: Effective
First Revised Sheet No. 309 First Revised Sheet No. 309 : Superseded
Superseding: Substitute Original Sheet No. 309
EXHIBIT A
DATED ............
Company:
Contract No.:
Receipt Point(s):
MDQ
Name / Location County/Parish Area State PIN No. (MMBtu)
---------------------------------------------- ------------------ ----- ------- -------
PRIMARY RECEIPT POINT(S):
.............................................. .................. ..... ....... .......
..............................................
..............................................
..............................................
SECONDARY RECEIPT POINT(S):
.............................................. .................. ..... ....... .......
..............................................
..............................................
..............................................
Receipt Pressure, Assumed Atmospheric Pressure
----------------------------------------------
Natural gas to be delivered to Trailblazer at the Receipt Point(s) shall be at a delivery
pressure sufficient to enter Trailblazer's pipeline facilities at the pressure maintained from time
to time, but Shipper shall not deliver gas at a pressure in excess of the Maximum Allowable
Operating Pressure (MAOP) stated for each Receipt Point in Trailblazer's Catalogue of Points. The
measuring party shall use or cause to be used an assumed atmospheric pressure corresponding to the
elevation at such Receipt Point(s).
Rates
-----
Except as provided to the contrary in any written agreement(s) between the parties in effect
during the term hereof, Shipper shall pay Trailblazer the applicable maximum rate(s) and all other
lawful charges as specified in Trailblazer's applicable rate schedule.
Fuel Gas and Unaccounted For Gas Percentage (%)
-----------------------------------------------
Shipper will be assessed the applicable percentage for Fuel Gas and Unaccounted For Gas unless
Trailblazer and Shipper mutually agree on monetary reimbursement.