Trailblazer Pipeline Company

Third Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 06/23/1994, Docket: RP94-257-000, Status: Effective

First Revised Sheet No. 155 First Revised Sheet No. 155 : Superseded

Superseding: Original Sheet No. 155

GENERAL TERMS AND CONDITIONS

----------------------------

 

(f) The Releasing Shipper may withdraw its posted

Capacity Release Request during an open season under this Section 19

only if the Releasing Shipper has a need for the capacity for its

own use not anticipated at the time of its Capacity Release Request;

following the close of the open season, a Releasing Shipper may not

reject a winning Qualified Bid. Notice of a withdrawal of a

Capacity Release Request must be delivered to Trailblazer's DART

system (or in writing for posting on Trailblazer's DART system if

Trailblazer's system is unavailable for receiving Capacity Release

Requests) no later than the end of the open season for the Capacity

Release Request.

 

(g) Unless the Capacity Release Request states

otherwise, the average monthly transportation flow used to evaluate

a Qualified Bid whose revenues will vary by the volume transported

shall be ten percent (10%) of the Qualified Bid capacity.

 

(h) Any Capacity Release Request not in compliance with

this Section 19.5 and the other provisions of Trailblazer's Tariff

shall be null and void and, even if posted, may be removed from

Trailblazer's DART system by Trailblazer at any time.

 

19.6 OPEN SEASON EXCEPTIONS

 

An open season is not required for: (a) a Prearranged

Release for the maximum reservation charge applicable to the

capacity being released; or (b) a Short-term Prearranged Release. A

Capacity Release Request which is not subject to an open season need

only contain the information required in Sections 19.4(a) and (b).

Such Capacity Release Request must be delivered to Trailblazer's

DART system (or in writing for posting on Trailblazer's DART system

if Trailblazer's DART system is unavailable for receiving Capacity

Release Requests) sufficiently in advance so that the release may

become effective under Section 19.9 before the release transaction

is to commence. In the case of releases for which service is to

commence on the first day of a month, the Capacity Release Request

should be submitted no later than 11:00 a.m. Central Time two (2)

business days prior to the day nominations are due under Section

10.2 of these General Terms and Conditions for first of the month

service. A Releasing Shipper may not rollover, extend or in any way

continue a Short-term Prearranged Release with the same Replacement

or Subreplacement Shipper until one month after the Short-term

Prearranged Release has ended unless the Releasing Shipper complies

with the Capacity Release Request provisions in Sections 19.3

and 19.4.