Trailblazer Pipeline Company
Third Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 06/23/1994, Docket: RP94-257-000, Status: Effective
First Revised Sheet No. 155 First Revised Sheet No. 155 : Superseded
Superseding: Original Sheet No. 155
GENERAL TERMS AND CONDITIONS
----------------------------
(f) The Releasing Shipper may withdraw its posted
Capacity Release Request during an open season under this Section 19
only if the Releasing Shipper has a need for the capacity for its
own use not anticipated at the time of its Capacity Release Request;
following the close of the open season, a Releasing Shipper may not
reject a winning Qualified Bid. Notice of a withdrawal of a
Capacity Release Request must be delivered to Trailblazer's DART
system (or in writing for posting on Trailblazer's DART system if
Trailblazer's system is unavailable for receiving Capacity Release
Requests) no later than the end of the open season for the Capacity
Release Request.
(g) Unless the Capacity Release Request states
otherwise, the average monthly transportation flow used to evaluate
a Qualified Bid whose revenues will vary by the volume transported
shall be ten percent (10%) of the Qualified Bid capacity.
(h) Any Capacity Release Request not in compliance with
this Section 19.5 and the other provisions of Trailblazer's Tariff
shall be null and void and, even if posted, may be removed from
Trailblazer's DART system by Trailblazer at any time.
19.6 OPEN SEASON EXCEPTIONS
An open season is not required for: (a) a Prearranged
Release for the maximum reservation charge applicable to the
capacity being released; or (b) a Short-term Prearranged Release. A
Capacity Release Request which is not subject to an open season need
only contain the information required in Sections 19.4(a) and (b).
Such Capacity Release Request must be delivered to Trailblazer's
DART system (or in writing for posting on Trailblazer's DART system
if Trailblazer's DART system is unavailable for receiving Capacity
Release Requests) sufficiently in advance so that the release may
become effective under Section 19.9 before the release transaction
is to commence. In the case of releases for which service is to
commence on the first day of a month, the Capacity Release Request
should be submitted no later than 11:00 a.m. Central Time two (2)
business days prior to the day nominations are due under Section
10.2 of these General Terms and Conditions for first of the month
service. A Releasing Shipper may not rollover, extend or in any way
continue a Short-term Prearranged Release with the same Replacement
or Subreplacement Shipper until one month after the Short-term
Prearranged Release has ended unless the Releasing Shipper complies
with the Capacity Release Request provisions in Sections 19.3
and 19.4.