Trailblazer Pipeline Company

Third Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 06/01/1997, Docket: RP97-336-001, Status: Effective

First Revised Sheet No. 104A First Revised Sheet No. 104A : Superseded

Superseding: Original Sheet No. 104A

GENERAL TERMS AND CONDITIONS

----------------------------

 

1.31 SYSTEM

 

"System" shall mean the pipeline, any compression, and

related facilities owned by Trailblazer.

 

1.32 UNACCOUNTED FOR GAS

 

"Unaccounted For Gas" shall mean the thermal equivalent

of the difference between the sum of all input volumes of gas to the

System and the sum of all output volumes of gas from the System,

which difference shall include but shall not be limited to gas

vented (other than gas vented pursuant to Section 6.7 hereof or

changes, if any, in line pack during that month) and gas lost as a

result of an event of Force Majeure, the ownership of which cannot

be reasonably identified, but shall not include Fuel Gas.

 

1.33 UNAUTHORIZED OVERRUN GAS

 

"Unauthorized Overrun Gas" shall mean Overrun Gas not

accepted by Trailblazer for scheduling pursuant to Section 10

hereof.

 

1.34 YEAR

 

"Year" shall mean a period of three hundred sixty-five

(365) consecutive days or three hundred sixty-six (366) consecutive

days if such period includes February 29.