Trailblazer Pipeline Company

Third Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 01/01/1998, Docket: RP97-408-000, Status: Effective

Fourth Revised Sheet No. 11 Fourth Revised Sheet No. 11 : Superseded

Superseding: Third Revised Sheet No. 11

RATE SCHEDULE T

---------------

 

operational date of a System expansion occurs on any day other than

the first day of a month, then the Demand Charges for such month

relating to the increase in capacity resulting from the System

expansion shall be reduced proportionately based on the ratio of the

number of days that expanded transportation service was not in

effect to the total number of days in such month.

 

4.3 COMMODITY RATE

 

In addition to the monthly Demand Charge, Shipper shall

each month pay Trailblazer a Commodity Charge in an amount equal to

the product of: (a) volumes (in Dth) received by Trailblazer from

Shipper at the points of receipt in Appendix A to the service

agreement during such month; and (b) Trailblazer's currently

effective commodity rate as set forth in the Currently Effective

Rates section of this Tariff.

 

4.4 TARIFF CHANGES

 

Trailblazer may apply to the FERC for changes in this

Rate Schedule, from time to time, without prejudice to the rights of

any Shipper to contest such changes.

 

5. FLEXIBLE POINTS

 

Shippers under this Rate Schedule T shall be accorded

the same flexibility with regard to primary, secondary and pooling

points as are provided to firm Shippers under Rate Schedule FTS.

 

6. MINIMUM BILL

 

After a Shipper's Contract Demand becomes effective,

such Shipper shall be obligated to pay monthly, at least a minimum

bill in the amount of the Shipper's Demand Charge computed pursuant

to Section 4.1 under all circumstances for the remaining term of the

service agreement between Trailblazer and such Shipper. Shipper's

obligation to pay the minimum bill shall not terminate nor be

reduced by any circumstances including, but not limited to, events

of Force Majeure, non-delivery of gas, suspension or termination of

operation or abandonment of the System, or any other circumstances

or events within or without the control or responsibility of the

Trailblazer.