Trailblazer Pipeline Company
Fourth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 10/11/2009, Docket: RP09-858-001, Status: Effective
Substitute First Revised Sheet No. 303 Substitute First Revised Sheet No. 303
Superseding: Original Sheet No. 303
EXHIBIT B
DATED ............
EFFECTIVE ............
Shipper:
Contract No.:
Delivery Point(s):
MDQ
Name / Location County/Area State PIN No. (Dth)
----------------------------------------------- ----------- ----- ------- ------
PRIMARY DELIVERY POINT(S):
1. ........................................... ............ ..... ....... .......
...........................................
...........................................
...........................................
SECONDARY DELIVERY POINT(S):
2. ........................................... ............ ..... ....... .......
...........................................
...........................................
...........................................
Delivery Pressure, Assumed Atmospheric Pressure
-----------------------------------------------
Natural gas to be delivered by Trailblazer to Shipper, or for Shipper's account, at the
Delivery Point(s) shall be at the pressures available in Trailblazer's pipeline facilities
from time to time. The measuring party shall use or cause to be used an assumed atmospheric
pressure corresponding to the elevation at such Delivery Point(s).