Original Sheet No. 257 Original Sheet No. 257 : Effective
GENERAL TERMS AND CONDITIONS
----------------------------
under this Section 40.6 to the extent the Operational Flow Order
requires action beyond Shipper's contract limits under its Agreement
with Trailblazer or if Shipper has complied within a reasonable range,
which range will be specified in the Operational Flow Order. Penalties
under this Section 40.6(f) shall be calculated as follows:
Imbalance Level Penalty (Greater of)
---------------------- ----------------------------
0% - 5% $0
Greater than 5% - 10% $0.25/Dth or 12.5% x AMIP
Greater than 10% - 20% $0.50/Dth or 25% x AMIP
Greater than 20% - 50% $1.00/Dth or 50% x AMIP
Greater than 50% $2.00/Dth or 100% x AMIP
The AMIP shall be calculated in accordance with Section 15.3(c) of
these General Terms and Conditions.
(g) Within ninety (90) days after an Operational Flow Order
has been lifted. Trailblazer will submit to the Commission a report
which describes the specific operational factors which caused the
Operational Flow Order to be issued and to be lifted.
40.7 CRITICAL TIME
(a) Trailblazer shall advise Shippers on its system if it
is declaring a Critical Time and shall specify the nature of the
situation creating the Critical Time.
(b) A Critical Time may be declared (1) when the total
physical receipts to all or a portion of the system are approaching or
expected to approach, a level that is in excess of the total physical
deliveries; (2) when the total physical deliveries from all or a
portion of the system are approaching or expected to approach, a level
that is in excess of the total physical receipts; (3) when system
pressure on one or more pipeline segments is falling and approaching a
level or is expected to fall and approach a level that is at or below
the minimum that Trailblazer considers necessary for system integrity
or to fulfill its firm contractual obligations; (4) when system
pressure is rising and approaching a level or is expected to rise and
approach a level that is at or above the maximum pressure at which
Trailblazer's facilities may be safely operated; or (5) at other times
when Trailblazer is unable or anticipates it may not be able to