GENERAL TERMS AND CONDITIONS

----------------------------

 

would alleviate such situation. Operational Flow Orders shall also

specify the time when compliance must be achieved. Such Operational

Flow Orders may, subject to Section 40.11, require a Shipper to take

any of the following actions, or similar actions, to the extent such

actions would tend to alleviate the situation to be addressed:

 

(1) Commence or increase supply inputs into

Trailblazer's system or at specific points, or shift such supply

inputs (in whole or in part) to different points.

 

(2) Cease or reduce supply inputs into

Trailblazer's system or at specific points.

 

(3) Commence or increase takes of gas from

Trailblazer's system or from specific points, or shift takes to

different points.

 

(4) Cease or reduce takes from Trailblazer's

system or at specific points.

 

(5) Reconcile transportation imbalances.

 

(6) Such other actions as are within Shipper's

control which may alleviate the situation to be addressed.

 

(c) No Shipper will be required under an Operational

Flow Order to exceed its total firm MDQ under its Agreements with

Trailblazer under Part 284 of the Commission's Regulations. Nor

will a Shipper be required to accept delivery of gas which the

Shipper cannot use in its plant or service territory. Further, a

Shipper subject to an Operational Flow Order issued to increase

deliveries at Receipt Points will have the option to decrease takes

at Delivery Points by a like amount instead, and vice versa.

Similarly, a Shipper subject to an Operational Flow Order issued to

decrease deliveries at Receipt Points will have the option to

increase takes at Delivery Points by a like amount instead, and

vice versa.

 

(d) In issuing Operational Flow Orders to correct

problems with either too much gas or insufficient gas being received

vis-a-vis deliveries, Trailblazer will generally follow the following

sequence, to the extent there is sufficient time: