Trailblazer Pipeline Company
Fourth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/28/2007, Docket: RP08-168-000, Status: Effective
Original Sheet No. 252 Original Sheet No. 252 : Effective
GENERAL TERMS AND CONDITIONS
----------------------------
engineering and operating constraints, and for maintenance of
service at projected levels to all Shippers, consistent with
applicable priorities of service. The Operating Plan may include,
inter alia, a specification of:
(1) Desired levels of flow gas for each category
of Shipper during various periods of the year.
(2) Plans to deal with specific contingencies
Trailblazer anticipates may occur during the period covered by the
Operating Plan.
(b) The Operating Plan shall be for planning and
informational purposes only and shall not be binding on Trailblazer
or on any Shipper. It is further understood that, since all
elements of an Operating Plan are subject to continual change and
are contingent on the actions of numerous Shippers, the Operating
Plan may not necessarily be an accurate depiction of the system at
any point in time.
(c) Trailblazer may request that Shippers periodically
provide non-binding estimates of flow patterns, injections and
withdrawals and other operating parameters. Such information may be
used in preparation of the Operating Plan or in testing whether an
Operating Plan previously circulated requires revision.
40.4 OPERATIONAL CONTROL SEQUENCE
In the event Trailblazer's observations or
projections indicate that a situation is or may be developing in
which adequate pressures may not be maintained or the overall
operational integrity of its system (or any portion thereof)
could be threatened, or in the event that such a situation
actually occurs, Trailblazer is empowered by this Section to take
action to alleviate this situation. In responding to such a
situation, Trailblazer shall first apply the Advisory Action
procedures of Section 40.5. If such measures are not sufficient
in Trailblazer's judgment to address the situation fully,
Trailblazer shall next employ Operational Flow Orders as provided
in Section 40.6. In the event Operational Flow Orders alone are
not adequate, Trailblazer may invoke the Critical Time