Trailblazer Pipeline Company
Fourth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/28/2007, Docket: RP08-168-000, Status: Effective
Original Sheet No. 226 Original Sheet No. 226 : Effective
GENERAL TERMS AND CONDITIONS
----------------------------
22.12 FAILURE OF MEASURING EQUIPMENT
In the event any measuring equipment is out of
service, or is found registering inaccurately and the error is not
determinable by test, or by previous recordings, receipts or
deliveries through such equipment shall be estimated and agreed to
by the parties upon the first of the following methods which is
feasible:
(a) By correcting the error if the percentage of
error is ascertainable by calibration, special test, or
mathematical calculation, or in the absence of (a);
(b) By using the registration of any check meter or
meters, if installed and accurately registering, or in the absence
of both (a) and (b), then;
(c) By estimating the quantity of receipt or delivery
based on receipts or deliveries during preceding periods under
similar conditions when the measuring equipment was registering
accurately.
22.13 PRESERVATION OF RECORDS
Shipper and Trailblazer shall preserve for a period of
at least three (3) years, or for such longer period as may be
required by appropriate authority, all test data, charts and other
similar records.
22.14 THE SEQUENCE OF GAS RECEIPT
All gas delivered to Trailblazer by any Shipper under
Rate Schedule FTS shall be deemed to have been received by
Trailblazer prior to the receipt of any gas delivered under Rate
Schedule ITS from such Shipper on any day.