Trailblazer Pipeline Company
Fourth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/28/2007, Docket: RP08-168-000, Status: Effective
Original Sheet No. 212 Original Sheet No. 212 : Effective
GENERAL TERMS AND CONDITIONS
----------------------------
(d) QUANTITY ALLOCATION
In the event of an intra-day capacity recall, Trailblazer
shall determine the allocation of capacity between the Releasing
Shipper and the Replacement Shipper(s) based upon the Elapsed Prorata
Capacity (EPC). In any recall notification provided to Trailblazer,
the quantity should be expressed in terms of the adjusted total
released capacity entitlements based upon EPC. EPC means that
portion of the capacity that would have theoretically been available
for use prior to the effective time of the intraday recall based upon
a cumulative uniform hourly use of the capacity. The amount of the
capacity allocated to the Replacement Shippers(s) should equal the
original released capacity less the recalled capacity that is
adjusted based upon the EPC. Trailblazer shall not be obligated to
deliver in excess of the total daily contract quantity of the release
as a result of any recall. The service flexibility available to
either the Releasing Shipper or the Replacement Shipper for the
subject capacity shall not be less as a result of the recall.
(e) REPUTS
When capacity is recalled, it may not be reput for the
same gas day.
(f) DISPUTES
In the event of a dispute between the Releasing Shipper
and any other person as to the validity of any recall or reput, or the
status of the holder of the capacity rights, Trailblazer shall be
entitled to conclusively rely on any notice provided by the Releasing
Shipper. The Original Shipper, Replacement Shipper and/or
Subreplacement Shipper involved in any such dispute shall indemnify
and hold Trailblazer harmless from any costs, damages or expenses
relating to Trailblazer's reliance on such notice.