Trailblazer Pipeline Company
Fourth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/28/2007, Docket: RP08-168-000, Status: Effective
Original Sheet No. 22 Original Sheet No. 22 : Effective
RATE SCHEDULE FTS
-----------------
5.2 Shipper shall reimburse Trailblazer for Fuel Gas and
Unaccounted For Gas required in transporting gas hereunder as provided by
Sections 1.10, 1.16 and 1.34 of the General Terms and Conditions for
contracts to which the Existing System Recourse Rates are applicable.
Expansion 2002 Shippers and Shippers under contracts to which Expansion
2002 Recourse Rates are applicable under Section 5.1(b) hereof shall
reimburse Trailblazer for Fuel Gas required in transporting gas hereunder
as provided in the tracking mechanism set out in Section 41 of the General
Terms and Conditions of this Tariff. Such Shippers shall pay Unaccounted
For Gas on the same basis as any other Shipper.
5.3 (a) Shipper shall reimburse Trailblazer within five (5)
days after costs have been incurred by Trailblazer for all fees required
by the FERC or any regulatory body including, but not limited to, filing,
reporting, and application fees to the extent such fees are specifically
related to service for that Shipper hereunder and are not generally
applicable fees (such as general rate case filing fees).
(b) If Trailblazer constructs, acquires or modifies any
facilities to perform service hereunder, then as specified in an agreement
between the parties either:
(1) Shipper shall reimburse Trailblazer for the
cost of such facilities or facility modifications as described in the
General Terms and Conditions of this Tariff; or
(2) Trailblazer shall assess a monthly charge
reflecting such facility costs.
5.4 The ACA charge will be assessed, when applicable, as
provided in the General Terms and Conditions of this Tariff, on volumes
received by Trailblazer from Shipper under this Rate Schedule FTS.
5.5 (a) Trailblazer shall have the unilateral right to file
with any appropriate regulatory authority and make changes effective in:
(1) the rates and charges applicable under this Rate Schedule FTS,
including both the level and design of such rates and charges; or (2) the
terms and conditions of this Rate Schedule FTS. Trailblazer agrees that
Shipper may protest or contest the aforementioned filings, or may seek
authorization from duly constituted regulatory authorities for such
adjustment of Trailblazer's existing FERC Gas Tariff as may be found
necessary to assure that its provisions are just and reasonable.