Oktex Pipeline Company
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 09/01/2005, Docket: RP05-511-000, Status: Effective
Tenth Revised Sheet No. 30 Tenth Revised Sheet No. 30 : Effective
Superseding: Ninth Revised Sheet No. 30
6. Fuel reimbursement. (Refer to NAESB Standards 1.3.15 and
1.3.16).
7. Pooling. (Refer to NAESB Standards 1.3.17, 1.3.18, 1.3.20-77, and 1.3.79).
8. Allocations and flowing gas procedures. (Refer to NAESB
Standards 2.3.2 through 2.3.8, 2.3.10 through 2.3.15, 2.3.17-23,
2.3.25-35, and 2.3.40-64). PDA data elements should be standardized. List of
allocation methodology types agreed upon:
Ranked, Pro Rata, Percentage, and Swing.
9. Balancing. It is recognized that the Parties are unable
to control exactly the quantity of gas received and delivered
hereunder on any day and that the receipts and deliveries by
Transporter may vary above or below the quantity scheduled on
any day. Such variations shall be kept to a minimum permitted by
operating conditions and shall be balanced at the Point(s) of
Receipt and/or Delivery as soon as practicable. Upon termination
of the service agreement, any then existing imbalance between
receipts by Transporter from Shipper, less Shipper's Pro Rata
Share of Company Used Gas and Unaccounted For Gas and
Transporter's deliveries to Shipper or for Shipper's account,
shall be brought into balance within sixty (60) days of the
termination of the contract Transporter shall not be obligated to
deliver to Shipper on any day a greater quantity of gas than
it has received from Shipper on such day, reduced by Shipper's
Pro Rata Share of any Company Used Gas and Unaccounted
For Gas.
10. Transporter shall keep accurate records of the quantities
of gas scheduled for transportation and any imbalances, which
records shall be made available to Shipper at its request.
11. For Data Dictionary Standards Refer to NAESB Standards
1.4.1 through 1.4.7, 2.4.1 through 2.4.16)
12. A Shipper which has been awarded firm capacity in a
capacity release may submit a nomination using such capacity
at the earliest available nomination opportunity pursuant to NAESB
standard 1.3.2..If transporter requires a replacement shipper to
enter into a contract, the contract must be issued within
one hour after the pipeline has been notified of the release.
XI. OTHER OPERATING CONDITIONS
1. In no event shall Transporter be required to accept a
request for transportation service for a quantity of gas which
Transporter cannot meter with reasonable accuracy at the
Receipt or Delivery Points for which Shipper is requesting
service. If Shipper's request for transportation service involves
a quantity which Transporter cannot meter with reasonable
accuracy at the requested Receipt or Delivery Point, Transporter
will promptly so inform Shipper and advise Shipper of the
minimum quantity that can be metered with reasonable
accuracy at the proposed Receipt and Delivery Points