Questar Southern Trails Pipeline Company
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 06/01/2002, Docket: RP02-318-000, Status: Effective
Original Sheet No. 110 Original Sheet No. 110 : Effective
GENERAL TERMS AND CONDITIONS
Southern Trails shall post a revised FGRP five days in advance
of the first of each month to be effective during the month.
Southern Trails shall have the right to adjust the FGRP to
reflect the actual quantity of gas used by Southern Trails so
as not to create an imbalance on its system. The FGRP will
include three components: (1) system gas consumption, (2) lost
or gained and unaccounted-for quantities and (3) prior 12
months' ending March 31, variance adjustment that includes
unamortized or over amortized quantities from the proceeding
July 1, through June 30, 12-month amortization period.
(b) Calculation. The monthly FGRP will be calculated
using the most recent available actual data and be equal to
(i) plus (ii) plus (iii) of this section.
(i) Projected monthly lost and unaccounted-for
component of the FGRP will equal (i)(1) divided by (i)(2):
(1)Projected transmission system losses or
gains and unaccounted-for quantities will be calculated by
subtracting the physical transmission deliveries for the
month, two months previous to the projected month, including
actual system gas consumed, from corresponding physical
transmission receipts as adjusted for anticipated changes in
system operations.
(2)Projected monthly scheduled transportation
receipt quantities. Projected monthly scheduled
transportation receipts will be based on the scheduled
transmission receipt quantities for the month, two months
previous to the projected month, as adjusted for anticipated
changes in system operations.
(ii) Projected monthly system gas consumption.
Projected transmission system gas consumption will be based on
the actual fuel consumed at each compressor station,
extraction plant or other fuel consuming facility for the
month, two months previous to the projected month, as adjusted
for anticipated changes in system operations divided by
projected monthly scheduled transportation receipt quantities.
Projected monthly scheduled transportation receipts will be
based on the scheduled transmission receipt quantities for the
month, two months previous to the projected month, as adjusted
for anticipated changes in system operations.
(iii) Prior 12 months ending March 31 variance
adjustment. The variance adjustment for each 12 months ending