Questar Southern Trails Pipeline Company
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 03/01/2003, Docket: RP02-318-002, Status: Effective
First Revised Sheet No. 58 First Revised Sheet No. 58 : Effective
Superseding: Original Sheet No. 58
GENERAL TERMS AND CONDITIONS
scheduled once the withdrawn capacity-release offer has been
revised and reposted.
(f) A releasing Shipper may post on Questline a
pre-arranged deal at the maximum rate to determine if another
Shipper would be willing to offer better terms and
conditions.
(g) A releasing Shipper shall not be able to
specify an extension of the original bid period or the pre-
arranged deal match period, without posting a new release.
7.9 Awarding of Contingent Bids. Released capacity
will not be awarded to a bidder submitting a contingent bid
until the releasing Shipper has notified Southern Trails
through Questline that all contingencies have been met. If
all contingencies have not been met by the deadline
established by the releasing Shipper, the released capacity
shall revert back to the releasing Shipper unless Southern
Trails has been directed by the releasing Shipper to award
the capacity to the next highest bidder.
7.10 Bids for Released Capacity. A Shipper may submit a
bid for released capacity at any time during the bid period.
(a) Each bid for released capacity must include
the following:
(i) Released capacity transaction
number;
(ii) Bidding Shipper's name and the name
and telephone number of the individual placing the bid.
(iii) The beginning and ending dates
of the proposed capacity acquisition.