Questar Southern Trails Pipeline Company

Original Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 10/14/2008, Docket: CP99-163-004, Status: Effective

Second Revised Sheet No. 47 Second Revised Sheet No. 47

Superseding: First Revised Sheet No. 47

 

GENERAL TERMS AND CONDITIONS

 

(e) Capacity sold during the bid period will be available no

sooner than the first day of the month succeeding the bid period.

 

(f) Southern Trails, at its discretion, may decline to award the

capacity and repost it in subsequent bid periods if a satisfactory bid has not

been received.

 

6.5 Bidding Information. Each bid for capacity must include the

following:

 

(a) Capacity transaction number.

 

(b) Bidding Shipper's name and the name and telephone number of

the individual placing the bid.

 

(c) The beginning and ending dates of the proposed capacity

acquisition.

 

(d) The maximum reservation charge the bidding Shipper is

willing to pay for the capacity.

 

(e) The desired RDC stated in Dth/day.

 

(f) Whether the bidding Shipper will accept a pro rata alloca

tion of capacity and the minimum amount of capacity the bidding Shipper is

willing to accept.

 

(g) A designation of whether Shipper is a local distribution

company, intrastate pipeline company, interstate pipeline company, producer,

end user or marketer.

 

(h) Whether Shipper is a marketing or energy affiliate of

Southern Trails.

 

(i) The name of the local distribution company or intrastate

pipeline company on whose behalf the gas will be transported if 18 C.F.R. Part

284, Subpart B service is requested.

 

(j) If § 311 service is requested, a declaration explaining how

the requested service qualifies as § 311 service.

 

6.6 Bidding Conditions.